top of page
Search

Hilsea Lido, Portsmouth

  • Writer: tssurveyingequipme
    tssurveyingequipme
  • Nov 24, 2024
  • 1 min read

Updated: Aug 27

At Hilsea Lido, our surveying team played a pivotal role in one of Portsmouth’s most exciting heritage regeneration projects.

ree

Working in collaboration with Woodmace, we supported the construction and restoration of the historic outdoor swimming pool, ensuring precision and efficiency at every stage. Our contribution included:

  • Precision Site Surveying: Conducted detailed topographic and boundary surveys to establish accurate site conditions before construction began.

  • Structural Alignment & Control: Assisted contractors with layout checks and control points, ensuring critical elements like pool edges, drainage systems, and walkways aligned precisely with design plans.

  • Bonus—Heritage-Sensitive Methodology: Using non-intrusive techniques, we managed to maintain the site’s heritage integrity while delivering modern engineering accuracy.

Our work helped ensure construction proceeded smoothly, maintaining the historic character of the Lido while enabling high-quality, safe development for the community.


 
 
 

Comments


bottom of page